Nilay Toshniwal · BITS Goa · a journey in three stops
Welcome aboard.
Undergrad at BITS Goa. I like building things.
Chapter one · The map
Every station is a thing I built.
Network map · 20 stations · pocket edition 3 under construction
Click to board →
InternshipsHardwareMLMarketsCommunity Interchange Under construction
Planned extension
Next stops, not yet open.
- Oct 2026 A scheduling engine for Schneider Yuva Yodha, the scheduler track. Committed; the build follows the September crunch.
- 2026 Q4 Physical design and test The part of the chip flow I have not touched yet: placement, routing, timing closure, test insertion.
- TBD Drive the train A game on this site. Arrow keys, the map, and a stamped ticket for every station you reach.
Chapter two · At the depot
Notes pinned at the depot.
Depot noticeboard
Now boarding · 2026-09-17
Now boarding
This board updates when a station opens or something breaks in an interesting way. It is not a status page, so it will not say what is being built until it is built.
Lost and found · 2026-09-10Lost and found
A few things got started here and stopped quietly. The reason is usually boring: the interesting part turned out smaller than expected, or someone else had already built it better. Not every attempt gets a station.
Pinned quote · 2026-09-05The best way to predict the future is to invent it.
Chapter three · Last stop
Get in touch.
Single journeyValid any day
To
Nilay Toshniwal
toshniwalnilay@gmail.comFromYou
ViaEmail, or the links on the stub
ClassAny line
Issued24 SEPT 2026